Financial Number:
431717-1-52-01
Project Length: 0.295 miles
Project Limits: NW 15th Way from Sistrunk Boulevard / NW 6th Street to NW 7th Street, NW 7th Street from NW 15th Way to NW 15th Terrace, and NW 15th Terrace from Sistrunk Boulevard / NW 6th Street to NW 7th Street
Start Date: September 28, 2015
Completed: May 27, 2016
Contractor: Russell Engineering, Inc.
Estimated Construction Cost: $1.4 million
Scope of Work
The improvements under this project consist of adding sidewalk along both sides of the road, adding solar powered pedestrian lighting, removing old asphalt and resurfacing the roadway, upgrading drainage structures, and upgrading landscaping.