Financial Number: 428731-1-52-01 & 430604-1-52-01
Project Length: 1.8 miles
Project Limits: Powerline Road from Sunrise Boulevard to NW 29 Street in Fort Lauderdale and Wilton Manors
Start Date: January 3, 2017
Completion Date: June 5, 2017
Contractor: Community Asphalt Corp.
Estimated Construction Cost: $2 million
Scope of Work
The improvements under this project consist of removing old asphalt and resurfacing the roadway, constructing new sidewalks, upgrading crosswalk ramps to meet ADA requirements, upgrading drainage structures, upgrading existing pedestrian signals to countdown timers, and upgrading signs and pavement markings to reflect the new roadway configuration which includes two 11-foot wide travel lanes and a 6-foot wide bike lane separated by a 3.5-foot wide buffer in each direction.
Project Flyer Powerline Road Improvements Project
|