SR 7 / US 441 Improvements Project in West Park, Miramar, and Hollywood

Financial Number: 227774-1-52-01

Project Length: 1.79 miles

Project Limits: SR 7 / US 441 from SW 25th Street to Fillmore Street

Start Date: January 5, 2015

Completion Date: Summer 2018

Contractor: Marks Brothers, Inc.

Estimated Construction Cost: $30.7 million

Scope of Work
Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and adding pedestrian countdown timers at  Pembroke Road, Washington Street, and Hollywood Boulevard, improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway.

PDF IconSR 7 Project Update Flyer – Summer 2016

 

Click here for upcoming lane closures

Project Photos

Pre - Construction

Click to view enlarged version/details

   

 

During Construction

Click to view enlarged version/details

 

 

 

Florida Department of Transportation
75 Express
95 Express
Florida 511 Travel Info
Twitter
SunGuide
Kids Zone
© 2014, Florida Department of Transportation District Four