Sunset Strip Complete Streets Project in Sunrise

Financial Number: 431666-1-52-01

Project Length:4.25 miles

Project Limits: Sunset Strip from Nob Hill Road to Sunrise Boulevard

Start Date: April 11, 2017

Completion Date: Summer 2018

Contractor: Roadway Construction LLC

Estimated Construction Cost: $3.4 million


Scope of Work
Project improvements include removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, adding roadway lighting, upgrading existing drainage structures and adding one new drainage structure east of NW 68 Avenue, replacing the signalized intersection at NW 64 Avenue with a roundabout, replacing the four-way stop sign at NW 19 Street with a roundabout, reconstructing sidewalks in various locations, upgrading signs and pavement markings, and adding bike lanes throughout the corridor as follows – Nob Hill Road to NW 15 Street: Eliminating a travel lane by milling, resurfacing, and restriping to provide one 12-foot travel lane and a 6-foot bike lane separated by a 3-foot striped buffer; NW 15 Street to Sunrise Boulevard: Widening the road to accommodate 5-foot bike lanes; At the intersections of Nob Hill Road, Pine Island Road, University Drive and Sunrise Boulevard, two through lanes will be maintained in each direction and the road will be widened to provide a 5-foot bike lane.

PDF IconMeeting Invitation Project Flyer Sunset Strip

 

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

     
 

Florida Department of Transportation
75 Express
95 Express
Florida 511 Travel Info
Twitter
SunGuide
Kids Zone
© 2014, Florida Department of Transportation District Four