Financial Number: 440554-2-52-01 & 440554-2-52-02
Project Length: 1.035 miles
Project Limits: From Approximately 2.3 Miles South of the Sebastian Inlet Northerly 1 Mile on SR A1A
Start Date: June 8, 2019
Completion Date: January 28, 2021
Contractor: Condotte America, Inc.
Estimated Construction Cost: $5,385,475
Scope of Work: The improvements include: constructing a sheet pile wall system on the west side of SR A1A with reinforced concrete caps and placing rip rap with ditch lining to protect the shoreline against the storm surge and wave action from the Intracoastal Waterway during severe storm events; repairing the failed pavement areas within the southbound travel lane; installing a new southbound 8-foot concrete sidewalk; and installing thermoplastic striping and pavement markings.
Click here for upcoming lane closures |