Project Limits: SR 15/US 441 from South of Shirley Drive to East Main Street
Start Date: July 29, 2022
Completion Date: Summer 2023
Contractor: Ranger Construction Industries, Inc.
Estimated Construction Cost: $4.5 million
Scope of Work:The project improvements consist of milling and resurfacing SR 15 in both directions, upgrading pedestrian lighting with LED luminaires along SE Barack Obama Boulevard at SR 15, installing new sidewalks, crosswalks, and curb ramps to meet Americans with Disabilities Act (ADA) standards, installing signage and pavement markings, and replacing existing guardrail.