State Road (SR) A1A/South Ocean Boulevard Improvements Project from North of Emerald Beach Way to South of SR 704/ Royal Palm Way

Financial Number: 446175-1-52-01

Project Length: 2.3 Miles

Project Limits: State Road A1A/South Ocean Boulevard from North of Emerald Beach Way to South of SR 704/ Royal Palm Way in the Town of Palm Beach

Start Date: May 27, 2025

Project Intro Video: 



Completion Date: Late 2026

Contractor: Halley Engineering Contractors, Inc.

Estimated Construction Cost: $8.2 Million

Scope of Work:

  • Milling and repaving the roadway throughout the project limits, including overbuild between Brazilian Ave. and SR 704/Royal Palm Way, to enhance infrastructure resilience and improve safety for the community
  • Replacing traffic signals with decorative mast arms at Golfview Rd./Hammon Ave., Worth Ave., and Peruvian Ave., and with standard mast arms at the Town of Palm Beach Fire Station, and SR 704/Royal Palm Way to improve infrastructure resiliency and enhance motorist safety
  • Upgrading pedestrian signals with new LED countdowns at Golfview Rd./Hammon Ave., Worth Ave., Peruvian Ave., and SR 704/Royal Palm Way
  • Installing drainage improvements just south of SR-80/Southern Blvd., just north of El Vedado Rd., and at SR 704/Royal Palm Way for enhanced drainage capacity
  • Upgrading roadway lighting throughout the project limits including decorative lighting at Worth Ave., Peruvian Ave., Chilean Ave., Australian Ave., and Brazilian Ave.
  • Upgrading curb ramps and replacing sections of the existing sidewalk to improve pedestrian safety and connectivity
  • Upgrading signage and pavement markings, including shared bicycle marking or “sharrows,” to enhance visibility and safety

Construction Impacts:

  • Work will occur in phases to minimize impacts to the public
  • Daytime lane closures are permitted the Monday before Thanksgiving through April 30th from 9:00 a.m. until 5:00 p.m., Monday through Friday; all other times from 8:00 a.m. until 6:00 p.m., Monday through Friday
  • Lane closures will utilize flaggers to direct traffic as needed
  • Sidewalk and curb ramp closures will be implemented as needed, restricting access to one direction of travel at a time
  • Access to businesses and residences will be maintained at all times

Documents:

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

Click to view enlarged version/details
Colony Maralago Roadway Worth
A1A turn off A1A on S. County S. County Curve Brazilian
Existing Typical 1 Existing Typical 3 Existing Typical 2 Existing Typical 4
Proposed Typical 1 Proposed Typical 2 Proposed Typical 3 Proposed Typical 4

During Construction

 

 




Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County


Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone
zero