I-95 Lighting and Roadway Improvements Project from South of the State Road 706 / Indiantown Road Interchange to the County Road 708 / SE Bridge Road Interchange

Financial Number: 434273-3-52-01 & 434273-4-52-01

Project Length: 11.59 miles

Project Limits: From south of the State Road 706 / Indiantown Road interchange to the County Road 708 / SE Bridge Road interchange

Start Date: September 9, 2020

Completion Date: Spring 2022

Contractor: CARR Construction, LLC

Estimated Construction Cost: $12,260,283

Scope of Work:
The improvements on this project include: installing roadway lighting with LED luminaires; replacing the SR 706 / Indiantown Road interchange high mast lighting system with a conventional LED roadway lighting system; installing roadway lighting with LED luminaires within the CR 708 / SE Bridge Road interchange; extending the northbound I-95 merge lane just north of SR 706 / Indiantown Road by 1,300 feet; extending the deceleration distances for the northbound I-95 to westbound SR 706 / Indiantown Road exit ramp and the southbound I-95 to eastbound SR 706 / Indiantown Road exit ramp; installing advance guide signs in the northbound and southbound direction of I-95 for SR 706 / Indiantown Road and in the northbound direction of I-95 for CR 708 / SE Bridge Road; installing curve warning signs on I-95 at the roadway curve north of SR 706 / Indiantown Road and at the curve south of CR 708 / SE Bridge Road; and installing wrong way vehicle detection systems at the SR 706 / Indiantown Road and CR 708 / SE Bridge Road interchanges.

Click here for upcoming lane closures

 

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

 
 
 

Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone