Financial Number: 446110-1-52-01
Project Length: 5.042 Miles
Project Limits: SR-5/US-1 from SE Contractors Way to north of SR-732/Jensen Beach Boulevard excluding SW Joan Jefferson Way to NW Wright Boulevard (no work on the Roosevelt Bridge).
Construction Start Date: July 25, 2022
In-Person Construction Open House: Thursday, June 1, 2023, from 6:00 p.m. to 7:00 p.m. at the City of Stuart City Commission, Commission Chambers, located at 121 SW Flagler Avenue, Stuart, FL 34994.
Virtual Public Meeting: Thursday, June 1, 2023, from 5:00 p.m. to 6:00 p.m. Please use the following link to register: https://bit.ly/3VlbsaI or dial (562) 247-8422, Access Code: 224-525-117 to join the meeting.
Start Date: June 2023
Completion Date: Spring 2024
Contractor: OHLA-USA, Inc.
Estimated Construction Cost: $12 million
Scope of Work: The project improvements on SR-5/US-1 consist of milling and resurfacing the existing roadway excluding SW Joan Jefferson Way to NW Wright Boulevard (no work on the Roosevelt Bridge), drainage improvements, constructing sidewalks to fill in missing gaps, upgrading curb ramps to meet Americans with Disabilities Act (ADA) standards, installing pedestrian pushbutton detectors at signalized intersections, and upgrading pavement markings and lighting signalized intersections.
Point of Contact:
Documents:
SR-5 Project Meeting Invitation Flyer June 1 2023
|