Financial Number: 439754-1-52-01
Project Length: 0.154 miles
Project Limits: State Road 9 / I-95 Northbound and Southbound Off-Ramps at Midway Road in St. Lucie County and the City of Port St. Lucie
Virtual Public Meeting:
Projected Letting: July 27, 2022
Start Date: Fall 2022
Completion Date: Late Winter 2023
Estimated Construction Cost: $1.8 million
Scope of Work:
- Add second left-turn lanes to both northbound and southbound off-ramps from SR 9 / I-95 to Midway Road (Exit 126).
- Widen and repave the existing SR 9 / I-95 off-ramps.
- Upgrade traffic signals with new mast arm poles and improve signalization timing and alignment.
- Implement Wrong Way Driving Countermeasure Systems and upgrade signing and marking.
Construction Impacts:
- Work will be completed in phases to minimize construction impacts.
- Partial lane closures where traffic will be shifted onto shoulders or temporary pavement will be required during construction along both ramps.
- Off-ramp access will be maintained throughout construction.