SR-9/I-95 Resurfacing and Safety Improvements Project
Financial Number: 443847-1-52-01
Project Limits: 3.2 miles
Project Length: From south of Gatlin Boulevard to St. Lucie West Boulevard
Start Date: June 2023
Completion Date: Summer 2024
Contractor: OHLA-USA, Inc.
Estimated Construction Cost: $9.9 million
Scope of Work:
The project improvements consist of extending the SR-9/I-95 northbound on-ramp auxiliary lane from Gatlin Boulevard and the SR-9/I-95 southbound on-ramp auxiliary lane from St. Lucie West Boulevard, installing a Dynamic Message Sign along SR-9/I-95 northbound south of the Gatlin Boulevard interchange to provide real time messages to motorists, installing LED roadway lighting on SR-9/I-95 between Gatlin Boulevard and Crosstown Parkway, upgrading interchange signage, resurfacing SR-9/I-95 and correcting cross-slopes, and installing a Dynamic Curve Warning System north of the Gatlin Boulevard interchange to provide a warning to motorists of excessive speed and wet pavement conditions.