State Road A1A Resurfacing, Restoration, and Rehabilitation (RRR) from South of Jasmine Lane to North of SR 60/Beachland Boulevard

Financial Number: 443996-1-52-01 and 440822-1-52-01443992-1-52-01

Project Length: 1.76 Miles (443996-1-52-01) and 0.40 miles (440822-1-52-01)

Project Limits: South of Jasmine Lane to North of SR 60/Beachland Boulevard (443996-1-52-01) and intersection improvements at various locations along SR A1A and SR 5/US-1 (440822-1-52-01)

Public Meeting Date and Time: Thursday, August 19, 2021, 6:00 PM to 7:30 PM

Meeting Location: Riverhouse, 305 Acacia Road, Vero Beach, FL 32963

The latest social distancing guidelines will be followed.

A Virtual Public Meeting was held on: Thursday, May 27, 2021 via GoToWebinar

To view a recording of the meeting, please click on the link below, and you will be directed to the YouTube page of the Florida Department of Transportation where you will be able to view the presentation in its entirety.

Click Here: https://youtu.be/ZbP-IeThYTw

Start Date: Spring 2022

Completion Date: Fall 2023

Estimated Construction Cost: $4 M

Scope of Work:

The scope of work for project 443996-1-52-01 includes:

  • Repaving and restriping existing asphalt pavement
  • Widening the roadway to accommodate a 7-foot buffered bicycle lane
  • Constructing a 6-foot sidewalk on the east side (Northbound direction)
  • Upgrading existing drainage
  • Rehabilitation of existing curb ramps to Americans with Disabilities Act (ADA) standards
  • Adding two signalized pedestrian mid-block crossings at Iris Lane and Dahlia Lane
  • Upgrading pedestrian signal and lighting at the intersection of SR A1A and SR 60/Beachland Blvd.
  • Enhancing signing throughout the corridor

The scope of work for project 440822-1-52-01 includes:

  • Constructing a southbound right turn lane at the intersection of SR 5/ US-1 and 8 Street
  • Extending the southbound right turn lanes at the intersections of SR A1A and the 17 Street Causeway and SR A1A and SR 60/Beachland Blvd.
  • Upgrading existing drainage

Construction Impacts:

  • Work will be phased to reduce impacts to the community
  • Temporary lane closures are anticipated during non-peak hours
    • 9:30 am to 3:30 pm Monday thru Sunday
    • 9:00 pm to 5:30 am week nights
  • Repaving and restriping will be performed at night
  • Access to all businesses and homes will be maintained at all times

Contact Information:

Documents:

PDF IconState Road A1A Resurfacing, Restoration, and Rehabilitation (RRR) Project Flyer

PDF Icon 443996-1 SR A1A Virtual Meeting Presentation 5.27.2021

PDF Icon443996-1 440822-1 Jasmine Lane A1A USR1 8 Street In Person Flyer Invitation




Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone