Financial Number: 438042-1-52-01
Project Length: 6.74 miles
Project Limits: From north of Tides Road to south of Coco Plum Lane
Start Date: June 22, 2020
Completion Date: Spring 2021
Contractor: C.W. Roberts Contracting, Inc.
Estimated Construction Cost: $6,709,661
Scope of Work: The improvements on this project include: resurfacing SR A1A from just north of Tides Road to just south of Coco Plum Lane; widening SR A1A to provide 7-foot shoulders in each direction to accommodate new buffered bikes lanes; installing signalization improvements; upgrading pedestrian signal features at the SR A1A / John’s Island Drive and SR A1A / Wabasso Beach Road intersections with LED countdowns; constructing drainage improvements; installing new signs and pavement markings; reconstructing pedestrian ramps to meet current Americans with Disabilities Act (ADA) requirements; installing Rapid Flashing Beacons at two (2) beach access pedestrian crossing locations; and making sidewalk repairs at various locations throughout the project limits.
Click here for upcoming lane closures
|