Financial Number: 447646-1-52-01
Project Limits: 2.054 miles
Project Length: SR 5/US 1 from Davis Street to the south end of the Bridge over the St. Sebastian River
Project Letting: SR 5/US 1 from Davis Street to the south end of the Bridge over the St. Sebastian River
Construction Start Date: Summer 2024
Anticipated Completion Date: Summer 2025
Estimated Construction Cost: $3.8 million
Virtual Public Meeting: $3.8 million
- Date: Tuesday, July 11, 2023, at 5:00 p.m.
Virtual Attendees: Please use the following link to register and receive a link to join the meeting: https://fdot.cc/SR5_US1_RRR_Registration. If you prefer to dial in by phone, please dial toll free (877) 309-2071, Access Code: 600-674-249.
- Date: Tuesday, July 11, 2023, at 6:30 p.m.
- In-Person Location: Sebastian Community Center, 1805 North Central Avenue, Sebastian, FL 32958. This meeting will have an informal open house format.
Scope of Work:
- Repaving the roadway
- Installing pedestrian countdown signal features at signalized intersections
- Reconstructing sidewalk curb ramps
- Upgrading lighting to better illuminate pedestrian crosswalks at signalized intersections
- Installing sidewalks at the northern end of the project limits
- Upgrading signing and pavement markings
Construction Impacts:
- Construction will occur in phases to reduce the impacts on the community.
- Lane closures will occur with one lane in each direction always maintained.
- Roadway repaving will be performed at nighttime.
- Driveway access to SR 5/US 1 will be maintained throughout construction.
- Access to emergency services, businesses and residences will be maintained at all times.
- Notification will be provided in advance for bus stop relocations.
Click here for upcoming lane closures
Documents:
447646-1 Improvements_webpage
447646-1 SR 5 Flyer
|