Financial Number: 446110-1-52-01
Project Length: 5.042 miles
- SR 5/US 1 from SE Contractors Way to North Jensen Beach Boulevard
Virtual Public Information Meeting:
- Date: Thursday, July 7, 2022, at 5:30 p.m.
- Virtual Attendees: Please use the following link to register and receive a link to join the meeting: https://fdot.cc/SR5US1resurfacing. If you prefer to dial in by phone, please dial toll free 1-(877) 309-2074, Access Code: 495-748-001.
- A brief presentation will start at 5:30 p.m.
In-Person Public Information Meeting:
Project Limits: Winter 2023
Start Date: Summer 2023
Completion Date: Winter 2024
Estimated Construction Cost: $8 Million
Scope of Work:
- Repave the existing travel lanes with the exception from SW Joan Jefferson Way to NW Wright Boulevard.
- No work is proposed on the Roosevelt Bridge.
- Construct sidewalks where feasible to fill in missing gaps.
- Install new pavement markings.
- Upgrade pedestrian pushbutton detectors at signalized intersections.
- Upgrade lighting at signalized intersections.
- Minor drainage improvements.
Construction Impacts:
- All work will be done in phases to reduce the impact of construction to the community.
- Daytime temporary lane closures during non-peak hours will occur.
- There will be no complete road closures.
- Access to businesses and residences will be maintained at all times.
Contact Information:
SR 5 RRR Presentation
Project Flyer
Click here for upcoming lane closures
|