Financial Number:
428726-1-52-01
Project Length: 1.8 miles
Project Limits: US 1 from Broward Boulevard to NE 17th Way in Fort Lauderdale
Start Date: July 10, 2015
Completion Date: June 28, 2016
Contractor: Community Asphalt Corp.
Estimated Construction Cost: $3.8 million
Scope of Work
The improvements under this project consist of removing old asphalt and resurfacing the roadway within the project limits, upgrading sidewalks and ramps to meet ADA requirements, repairing, adjusting, and replacing drainage structures throughout the project limits, upgrading the existing traffic signals to mast arm signals at the Sunrise Boulevard, NE 15th Avenue, NE 16th Terrace, and NE 17th Way intersections, installing a new signalized pedestrian crossing at NE 16th Terrace, upgrading all existing pedestrian signals to countdown timers, installing a video detection system at Broward Boulevard and US 1, upgrading signs and pavement markings throughout the project limits, including sharrows (share the road arrows) to the outside lane in each direction within the project limits, creating an Alternative Bike Route along local streets parallel to Sunrise Boulevard and through Holiday Park by adding sharrow pavement markings and signage along N Victoria Park Road, NE 11th Street, N Flagler Drive, NE 5th Avenue, NE 8th Street, G. Harold Martin Drive, NE 9th Street, NE 18th Avenue, NE 9th Place, and NE 20th Avenue.
Click here for upcoming lane closures
|