Financial Number: 438386-2-52-01/02/03/04
Project Length: 3.142 miles
Project Limits: SR 5/US 1 from 59th Street to CR 850/Northlake Boulevard
Start Date: August 2025
Completion Date: Late 2027
Contractor: OHLA-USA
Estimated Construction Cost: $13.4 million
Scope of Work:
The project improvements consist of milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and longevity; modifying the roadway to accommodate designated bicycle lanes in each direction to enhance bicyclist access and safety; constructing new median sections from Silver Beach Road to Palmetto Drive in the Town of Lake Park to enhance motorists safety; widening the sidewalks on the bridge over the Port of Palm Beach to construct a 10-foot shared use path to enhance pedestrian safety and cyclist travel; upgrading curb ramps and replacing sections of the existing sidewalk to improve pedestrian safety and connectivity; upgrading traffic and pedestrian signals at intersections throughout the project limits to enhance traffic flow and pedestrian access; retrofitting and installing new LED lighting, including decorative lighting, to enhance motorist awareness and pedestrian visibility at night; and upgrading signage and pavement markings, including installing bicycle markings, to enhance visibility and safety.
Documents: 438386-2_SR 5 Roadway Improvements Project_Construction Open House Flyer_.pdf
|