Treasure Coast Header Image

SR 5/US 1 Resurfacing, Restoration, and Rehabilitation (RRR) & Shared-Use Non-motorized (SUN) Trail Projects

Financial Numbers: 448447-1-52-01 & 448447-2-52-01

Project Length: 5.11 miles (RRR)/3.07 miles (SUN Trail)

RRR Project Limits: 

  • SR 5/US 1 from 0.5 mile south of SR A1A/SE Dixie Highway to SE Osprey Street

SUN Trail Project Limits: 

  • SR 5/US 1 from Bridge Road to SE Osprey Street

Virtual Public Meeting: Wednesday, July 23, 2025, from 5:30 p.m.

Virtual Attendees: Please use the following link to register and receive a link to join the meeting: fdot.cc/SR5_US1_RRR_VPMRegistration. If you prefer to dial in by phone, please dial toll free +1 (951) 384-3421, Access Code: 912-764-703.

In-person Public Meeting: Wednesday, July 23, 2025

In-Person Location: Hobe Sound Civic Center, 8980 SE Olympus Street, Hobe Sound, Florida 33455. This meeting will have an informal open house format.

Link to registration page: fdot.cc/SR5_US1_RRR_VPMRegistration

Projected Letting: April 2026

Anticipated Start Date: Summer 2026

Anticipated Completion Date: Early Winter 2027

Estimated Construction Cost:  $20 M

PROPOSED ROADWAY IMPROVEMENTS:

  • Repave the existing roadway to improve the resiliency of our infrastructure.
  • Replace and upgrade signs and pavement markings to meet current standards and increase reflectivity.
  • Improve drainage at the SE Bridge Road and Petty Street intersections and locations along the corridor where there is standing water today.
  • Upgrade all guardrail along the corridor to current standards to prevent errant vehicles from leaving the road, improving safety.
  • Modify the existing curb returns and ramps to comply with the Americans with Disabilities Act (ADA) standards to facilitate improved access for users with disabilities.
  • Construct sidewalk from Highbourne Way to the Jonathan Dickinson State Park entrance 600-feet to the south.

PROPOSED SUN TRAIL IMPROVEMENT:

  • Construct a 12-foot paved shared use path for bicyclists and pedestrians, physically separated from vehicular traffic, along the west side of US 1 from Bridge Road to Osprey Street.

CONSTRUCTION IMPACTS

  • Work will be done in phases to reduce the effects of construction on the community.
  • Daytime and nighttime work will be performed within the project limits.
  • Access to businesses and residences will be maintained during construction.
  • Another public meeting (Construction Open House) will be held prior to construction. Detailed information about how to keep informed of potential construction impacts will be provided at this meeting.

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Click here for upcoming lane closures

 

 

 




Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County

Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
zero