Financial Number:
227775-1-52-01
Project Length: 2.08 miles
Project Limits: SR 7 / US 441 Fillmore Street to South of Stirling Road
Start Date: Spring 2015
Completion Date: April 2, 2020
Contractor: Community Asphalt Corp.
Estimated Construction Cost: $29.6 million
Scope of Work
Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and add pedestrian countdown timers at Johnson Street, Taft Street, and Sheridan Street, installing new signalized intersection and pedestrian countdown timers at Fillmore Street, improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway.
|