State Road (SR) 816/Oakland Park Boulevard from Rock Island Road to East of NW 31 Avenue

Financial Number: 447675-1-52-01

Project Length: 2.73 Miles

Project Limits: State Road (SR) 816/Oakland Park Boulevard from Rock Island Road to East of NW 31 Avenue

Project Purpose: The Resurfacing, Restoration and Rehabilitation (RRR) project will extend the service life of the pavement, enhance roadway safety, and improve operating characteristics of the corridor.

A Public Meeting Was Held: Thursday, March 7, 2024, at 6:00 p.m. The public meeting was conducted both in-person and virtually simultaneously.

The in-person public meeting was held at the City of Lauderdale Lakes/Educational and Cultural Center, located at 3580 W Oakland Park Boulevard, 2nd Floor, Lauderdale Lakes, Florida 33311, doors open at 5:30 p.m.

The virtual public meeting was held via GoToWebinar.

Participants attended in-person and virtually. The public meeting consisted of a formal presentation followed by an open discussion. Staff were available to answer questions and provide assistance. Comments and questions were answered in the order received.

Public Meeting Recording: https://youtu.be/JfxMzjfycik

Anticipated Construction Start Date: Fall 2025

Anticipated Completion Date: Late 2026

Estimated Construction Cost: $7.5 Million

Scope of Work:

  • Repave and restripe the existing roadway within the project limits.
  • Update deficient curb ramps/detectable warning surfaces to comply with the Americans with Disabilities Act (ADA) to enhance safety for all pedestrians.
  • Improve access to bus stops and add landing pads where missing to improve transit connectivity.
  • Upgrade signing and pavement markings.
  • Modify existing signals to increase signal visibility and reduce rear-end crashes.
  • Modify signal timing to improve efficiency and maximize throughput capacity.
  • Update corridor lighting to comply with current required illumination levels.

Construction Impacts:

  • Work will be done in phases to reduce the effects of construction on the community.
  • Temporary lane closures will be required:
    • A single lane on both sides of the roadway can be closed any time during the day except within 600-feet of signalized intersections.
    • Two lanes can be closed only at nighttime from 8 p.m. to 6 a.m. except within 600-feet of signalized intersections.
    • Within 600-ft of signalized intersections, a single lane can be closed only at nighttime from 8 p.m. to 6 a.m. and two lanes can be closed from 10 p.m. to 5 a.m.
  • Resurfacing will be done during nighttime hours using one-lane or two-lane closures.
  • Access to businesses and residences will be always maintained.
  • No detours are expected.

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Documents:

PDF Icon447675-1 - Flyer - SR-816-Oakland Park Blvd

 

Pre Construction:

Click to view enlarged version/details
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express