FDOT District Four - Palm Beach Header Image

Current Construction Lane Closures in Southern Palm Beach County

Aug 7 - Aug 14, 2020

SR A1A/Haven Ashe Bridge Maintenance Project over the Boca Raton Inlet

Restrictions:

All lanes are open

Advance Notice: The SR A1A/Have Ashe Bridge will be closed for a maximum of 60 days beginning in August. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at (561) 886-8773 or angel@valerin-group.com.


US 1 Resurfacing Project from south of Eve Street to south of Harbourside Drive

Restrictions:

One lane may be closed in each direction, intermittently, 9 a.m. until 3 p.m., daily, and 9 p.m. until 6 a.m., nightly, Sunday night through Friday afternoon. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


Swinton Avenue Resurfacing Project

Restrictions:

One lane may be closed in each direction, intermittently, from S 10th Street to 4th Street/Lake Ida Road, 7 a.m. until 6 p.m., Monday through Friday, through fall 2020. Flaggers will be on-site to direct traffic as needed. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


US 1 Improvements Project from George Bush Boulevard to Murano Bay Drive

Restrictions:

One lane may be closed in each direction, daily, 7 a.m. until 3 p.m., and nightly, 9 p.m. until 6 a.m., Sunday night through Friday afternoon, through fall 2020.

Nighttime paving operations are underway along the project corridor, 9 p.m. until 6 a.m., Sunday through Thursday nights, moving to different locations each week. Mainline and side street paving began on the south end of the project limits, and is working north through approximately September 2020, weather permitting. In order for this work to be completed, sections of on-street parking may be closed with orange barrels for a few days at a time, as needed. Please see flyer attached. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


El Clair Ranch Road Bridge Replacement

Restrictions:

Full Bridge Closure: The bridge is closed for reconstruction through spring 2021. Southbound motorists may detour via Flavor Pict Road westbound to Jog Road, southbound to Lake Ida Road, then eastbound to El Clair Ranch Road. Northbound motorists may detour via Lake Ida Road westbound to Jog Road, northbound to Flavor Pict Road, then eastbound to El Clair Ranch Road. Via Delray Boulevard, just south of the bridge closure, will also be available for motorists to head eastbound from El Clair Ranch Road. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


Seminole Drive Bridge Replacement

Restrictions:

Full Bridge Closure: The bridge is closed for reconstruction through early 2021. Motorists may detour via Lawrence Road and Tallulah Road. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


Boynton Beach Boulevard Improvements Project from Congress Avenue to west of Jog Road

Restrictions:

The inside lane, from Jog Road to Congress Ave., may be closed in each direction, around-the-clock, Monday through Friday. Two lanes will remain open in each direction during this time.

The outside lane, from Jog Road to Congress Ave., may be closed in each direction, around-the-clock, Monday through Friday. Two lanes will remain open in each direction during this time.

Two lanes may be closed in each direction, from west of Lawrence Rd. to east of Congress Ave., 9 p.m. until 6:30 a.m., Sunday night through Friday morning. One lane will remain open in each direction during this time. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


Boynton Beach Boulevard Improvements Project from Lyons Road to Florida’s Turnpike

Restrictions:

One lane of Boynton Beach Boulevard may be closed in each direction, 9 a.m. until 4 p.m., Monday through Friday, through August 2020

One lane of Lyons Road at the Boynton Beach Boulevard intersection may be closed in each direction, 9 a.m. until 4 p.m., Monday through Friday. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


Fiber Optic Communication Cable Improvements Project

Restrictions:

Portions of the outside shoulder and sidewalk may be closed in each direction, intermittently, on Seminole Pratt Whitney Road, just north of Southern Boulevard to Orange Boulevard, 7 a.m. until 7 p.m., Monday through Friday, through August 2020.

Portions of the outside shoulder and sidewalk may be closed in each direction, intermittently, from NW 40th Street to Butts Road, 7 a.m. until 7 p.m., Monday through Friday, through August 2020. For more information, please contact Community Outreach Specialist Meredith Cruz at 561-641-6440 or mcruz@corradino.com.


South Florida Rail Corridor (SFRC) Safety Improvements Project

Restrictions:

All lanes are open. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) 218-2304 or rguerrero@corradino.com.


Please click on a link below to view lane closures in other areas of Palm Beach County:
I-95 Palm Beach CountyI-95 Palm Beach County Closures Northern Palm Beach CountyNorthern Palm Beach County Closures
Southern Palm Beach CountySouthern Palm Beach County Closures Western Palm Beach CountyWestern Palm Beach County Closures
Central Palm Beach CountyCentral Palm Beach County Closures Bridges Palm Beach CountyPalm Beach County Bridge Closures
Palm Beach County Maintenance ClosuresMaintenance, Utility and Permit Closures  
 
Florida Department of Transportation
Kids Zone
© 2014, Florida Department of Transportation District Four