State Road 25/Hwy 27 Resurfacing and Restoration Project

Financial Number: 441631-1-32-01

Project Length: 13 miles

Project Limits: From the Hendry/Palm Beach County line to SR 80/East Palm Beach Road in Palm Beach County, Florida

Start Date: May 5, 2022

Completion Date: Early 2024

Contractor: Johnson Bros. Corporation

Estimated Construction Cost: $18 Million

Scope of Work: Project improvements include milling and resurfacing existing travel lanes and shoulders including shoulder widening, replacing or resetting guardrails along the roadway, restoring sidewalk at various locations and upgrading curb ramps to meet Americans with Disabilities Act (ADA) standards, adding pedestrian gates at the FEC Railroad crossing, improving lighting and replacing the signals at SR 80/East Palm Beach Road, upgrading pedestrian signals, pavement markings, and signing to current standards, installing rumble strips and internally illuminated retroreflective pavement markings

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Documents;

PDF IconProject Flyer

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
Asphalt installed along NB and SB SR 25_US 27   March 2024Asphalt installed along SB SR 25_US 27   March 2024
Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County
Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone