SR 9/I-95 Northbound Off-Ramp at SR 706/Indiantown Road Improvements Project
Financial Number: 439758-1-52-01, 02 and 03
Project Length: 1.446 miles
Project Limits: From the State Road (SR) 9/I-95 Northbound Off-Ramp to Eastbound State Road (SR) 706/Indiantown Road and on State Road (SR) 706/Indiantown Road from the Florida Turnpike entrance to Central Boulevard
Start Date: October 30, 2023
Completion Date: Summer 2025
Contractor: MasTec Civil, LLC
Estimated Construction Cost: $18 million
Scope of Work:
The project improvements consist of milling and resurfacing the existing roadway, re-aligning the SR 9/I-95 northbound to SR 706/Indiantown Road eastbound off-ramp to a new signalized intersection, lengthening the eastbound SR 706/Indiantown Road left turn lane to northbound SR 9/I-95, widening eastbound SR 706/Indiantown Road to provide an additional through lane and a buffered bike lane in various locations from the Florida Turnpike entrance to Central Boulevard, widening westbound SR 706/Indiantown Road to provide an additional through lane and a bike lane from 67th Road North to SR 9/I-95, widening the Indiantown Road Bridge over the C-18 canal in both directions to provide an additional through lane, upgrading Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, upgrading Digital Message Sign (DMS) structures on westbound SR 706/Indiantown Road between Island Way and 67th Road N, widening the I-95 northbound and southbound on-ramp acceleration lane, installing sidewalk along eastbound SR 706/Indiantown Road from the Florida Turnpike entrance to Island Way, upgrading curb ramps to meet Americans with Disabilities Act (ADA) standards, installing patterned pavement crosswalks at Central Boulevard, upgrading drainage, signage, lighting, signalization and pavement markings and upgrading Intelligent Transportation System (ITS) throughout the project corridor.