SR 9/I-95 Northbound Off-Ramp at SR 706/Indiantown Road Improvements Project

Financial Number: 439758-1-52-01, 02 and 03

Project Length: 1.446 miles

Project Limits: From the State Road (SR) 9/I-95 Northbound Off-Ramp to Eastbound State Road (SR) 706/Indiantown Road and on State Road (SR) 706/Indiantown Road from the Florida Turnpike entrance to Central Boulevard

Start Date: October 30, 2023

Completion Date: Summer 2025

Contractor: MasTec Civil, LLC

Estimated Construction Cost: $18 million

Scope of Work:

The project improvements consist of milling and resurfacing the existing roadway, re-aligning the SR 9/I-95 northbound to SR 706/Indiantown Road eastbound off-ramp to a new signalized intersection, lengthening the eastbound SR 706/Indiantown Road left turn lane to northbound SR 9/I-95, widening eastbound SR 706/Indiantown Road to provide an additional through lane and a buffered bike lane in various locations from the Florida Turnpike entrance to Central Boulevard, widening westbound SR 706/Indiantown Road to provide an additional through lane and a bike lane from 67th Road North to SR 9/I-95, widening the Indiantown Road Bridge over the C-18 canal in both directions to provide an additional through lane, upgrading Wrong-Way Driving Countermeasures on the SR 9/I-95 northbound and southbound exit ramps, upgrading Digital Message Sign (DMS) structures on westbound SR 706/Indiantown Road between Island Way and 67th Road N, widening the I-95 northbound and southbound on-ramp acceleration lane, installing sidewalk along eastbound SR 706/Indiantown Road from the Florida Turnpike entrance to Island Way, upgrading curb ramps to meet Americans with Disabilities Act (ADA) standards, installing patterned pavement crosswalks at Central Boulevard, upgrading drainage, signage, lighting, signalization and pavement markings and upgrading Intelligent Transportation System (ITS) throughout the project corridor.

Documents:

PDF IconI-95 at Indiantown Rd._July-Aug. Progress Update_073124.pdf

PDF IconIndiantown Road I95 project flyer

PDF IconSR 9 I 95 Indiantown PowerPoint Presentation

PDF IconProject Fact Sheet

Virtual Public Meeting:

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
Piles Cap Rebar   February 2024 Intermediate Bent 2 Pile formwork   WB Indi antown Rd. at C 18 Canal   February 2024 Formwork for pile cap   EB Indiantown  Rd. at C 18 Canal   February 2024 Embankment   February 2024
Intermediate Bent 2 Pile cap ? WB India ntown Rd. at C 18 Canal   March 2024 Formwork for pile cap ? EB Indiantow n Rd. at C 18 Canal   March 2024 Ramp A Earthwork   April 2024 Bridge 930391 over C 18 canal widening   April 2024
EB Indiantown Rd. Base Rock   May 2024 Bridge 930391 over C 18 Canal End Bent 6 Pile Cap   May 2024 EB Indiantown Rd. Base Rock   June 2024 Bridge 930391 over C 18 Canal End Bent Cap & Backwall   June 2024
Beams Set_South Side_Indiantown Rd. Looking East_070524Beams Set_North Side_Indiantown Rd. Looking East_070524
 
 
Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County
Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone