Financial Number: 444121-1-52-01
Project Length: $2.58 million
Project Limits: SR 9 / I-95 Southbound off-ramp at Belvedere Road
Start Date: Late 2023
Completion Date: Summer 2024
Contractor: Ranger Construction Industries, Inc.
Scope of Work:
Work consists of widening the roadway pavement on I-95 southbound to lengthen the off-ramp deceleration lane, installing speed feedback signs, milling and resurfacing, placement of high friction surface treatment on ramp, minor drainage modification, replacement/relocation of impacted sign structures, and installation of a Wrong Way Driving System.