Financial Number: 446551-1-52-01
Project Length: 1.658 miles
Project Limits: SR 710/MLK Jr Boulevard from North Congress Avenue to President Barack Obama Highway
Start Date: January 10, 2025
Completion Date: Summer 2025
Contractor: Horsepower Electric, Inc.
Estimated Construction Cost: $1.8 million
Scope of Work:
The project improvements include installing solar-powered traffic signs equipped with modern technology that detects bicyclists and activates flashing signals to warn drivers, improving safety for cyclists; installing Closed-Circuit Television (CCTV) cameras to enhance real-time traffic monitoring and improve motorist safety; upgrading the Advanced Transportation Management System (ATMS) technology to enhance coordination with the Regional Traffic Management Center (RTMC), improving traffic flow and enabling faster incident response; installing new traffic loops to optimize signal changes, enhancing safety and efficiency of the infrastructure.
Documents: SR 710_MLK Jr Blvd ATMS Project_Flyer_.pdf
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
|