Financial Number: 449810-1-52-01
Project Length: 0.482 miles
Project Limits: State Road 802/Lake Worth Road from Everett Court to east of Erie Street
Virtual Meeting: Thursday, October 9, 2025, (5:30 p.m. – 6:30 p.m.) Link to registration page https://attendee.gotowebinar.com/register/792057838656294744
In-person Meeting:
- Thursday, October 9, 2025, (6:30 p.m. – 7:30 p.m.)
- Palm Beach State College, Lake Worth Campus
- 4200 S Congress Avenue Lake Worth, Florida 33461
Projected Letting: Fall 2026
Start Date: Winter 2026
Completion Date: Winter 2028
Estimated Construction Cost: $2.1 M
Scope of Work:
- Repave the existing roadway to improve the resiliency of our infrastructure
- Install backplates with yellow retro-reflective borders on all signal heads to improve signal visibility for motorists
- Install new pedestrian pushbutton and countdown heads at Boutwell Road/Lake Osborne Drive and Akron Street
- Reconstruct damaged sidewalks and pull boxes
- Close the existing full median opening at S. Buffalo Street
- Extend the southbound left turn lane at Lake Osbourne Drive/Boutwell Road
- Convert the existing full median opening at Detroit Street to a directional median opening
Construction Impacts:
- Work will be done in phases to reduce the effects of construction on the community
- Temporary lane closures will occur one lane at a time during non-peak hours
- Pedestrian traffic will be maintained at all times
- Access to properties along the corridor will be maintained during construction