Financial Number: 437868-1-52-01
Project Length: 0.779 miles
Project Limits: S.R. 80/Southern Boulevard Ramps and U.S. 441/S.R. 7
Start Date: January 2026
Completion Date: Summer 2027
Contractor: General Asphalt Co. LLC
Estimated Construction Cost: $8.3 million
Scope of Work:
The project improvements include milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and improve safety for the community; widening the roadway and the C-51 canal bridge to accommodate dual right-turn lanes along northbound and southbound S.R. 7/U.S. 441, triple left-turn lanes along the eastbound and westbound S.R. 80/Southern Boulevard ramps, and dual right-turn lanes along the eastbound and westbound S.R. 80/Southern Boulevard ramps to improve traffic flow and capacity; reconstructing and signalizing the U-turns at the eastbound and westbound S.R. 80/Southern Boulevard ramps to enhance vehicular safety; upgrading curb ramps and replacing sections of the existing sidewalk to improve pedestrian safety and connectivity; constructing new traffic signal mast arms to accommodate the turn lanes along S.R. 7/U.S. 441 and the S.R. 80/Southern Boulevard ramps; upgrading pedestrian signals with new LED countdowns at intersections throughout the project corridor to enhance pedestrian use; retrofitting and installing new LED lighting to improve motorist awareness and pedestrian visibility at night; and upgrading signage and pavement markings, including installing green bicycle markings, to enhance visibility and safety.
Point of Contact:
Documents:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
|