Financial Number: 448415-1-52-01
Project Length: 1.044 miles
Project Limits: S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard
Virtual Public Meeting: Wednesday, January 7, 2026, from 5:00 p.m. to 6:00 p.m. Please use the following link to register: https://tinyurl.com/2s37zrr9 You may also call +1 (914) 614-3221, Access code: 369-346-688
In-Person Construction Open House: Wednesday, January 7, 2026, from 6:00 p.m. to 7:00 p.m. at the Norton Museum of Art, 1450 S. Dixie Highway, West Palm Beach, FL 33401
Start Date: January 20, 2026
Completion Date: Late 2026
Contractor: General Asphalt Company, LLC
Estimated Construction Cost: $3.9 million
Scope of Work:
The project improvements consist of minor reconstruction, and milling and resurfacing the roadway throughout the project limits of S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard to enhance infrastructure resilience and safety for the community; reconstructing curb ramps to meet ADA criteria and replacing portions of the existing sidewalk to improve pedestrian safety, connectivity, and use; upgrading signing and pavement markings to enhance visibility and safety; replacing drainage structures within driveways; adding a new signalized mid-block crosswalk north of Vallette Way; upgrading pedestrian signalization at Belvedere Road and Flamingo Drive and the crosswalk north of Cranesnest Way; installing overhead flashing beacons within the school zone north and south of Flamingo Drive; and upgrading lighting to LED fixtures and installing a new light at Flamingo Drive.
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
Documents: SR 5 US 1 Belvedere to south of Okeechobee Project Flyer.pdf
|