Financial Number: 443591-1-52-01
Project Length: 0.327 miles
Project Limits: SR 7/US 441 at Oakes Road
Start Date: September 2023
Completion Date: Fall 2024
Contractor: Weekly Asphalt Paving, Inc.
Estimated Construction Cost: $2,144,350
Scope of work:
The project improvements consist of widening the eastbound approach on Oakes Road to provide dual left turn lanes and an exclusive right turn lane, striping 7-foot buffered bicycle lanes along southbound SR 7/US 441 between Oakes Road and south of the I-595 interchange, milling and resurfacing the roadway within the project limits, reconstructing existing sidewalks and curb ramps along Oakes Road, upgrading lighting, signing and pavement markings and upgrading the existing signalizations to mast arms.