Current Construction Lane Closures for Interstate Roads in Broward County
-
I-95 from south of Hollywood Boulevard in the City of Hollywood to south of Broward Boulevard in the City of Fort Lauderdale and I-595 from I-95 to SR-7 in the Town of Davie (95 Express Phase 3C)
I-95 Traffic Impact:
I-95 northbound, from I-595 to SR-84 has been shifted to the inside lanes to allow for widening and bridge construction operations. This pattern is anticipated to be in place through late 2023.
I-95 in each direction, from Hollywood Boulevard to south of Davie Boulevard, may have up to three lanes closed, nightly as needed, 9 p.m. until 5:30 a.m. Tuesday through Thursday. The first lane will close at 9 p.m., the second lane will close at 9:30 p.m., and the third lane will close at 10:30 p.m. and reopen at 5 a.m. All lanes will be open by 5:30 a.m.
I-95 in each direction, from Hollywood Boulevard to south of Davie Boulevard, will have shoulder closures, daily and nightly, as needed, Tuesday through Thursday.
I-95 northbound between Hollywood Boulevard and Sheridan street will have the outside lane closed nightly as needed 8 p.m. until 5:30 a.m., and the shoulder will be closed nightly, 7:30 p.m. until 6 a.m., Tuesday through Thursday.
The I-95 northbound managed lanes egress has been relocated to just south of Stirling Road. This condition is expected to be in place through late 2023.
The I-95 northbound and southbound managed lanes and the inside general-purpose lane from Ives Dairy Road to Sheridan Street will be closed nightly from 8 p.m. until 6 a.m., Tuesday through Thursday. FHP will be onsite to assist motorists.
The I-95 northbound managed lanes egress will be relocated to just south of Hollywood Boulevard through late 2023 for roadway widening operations.
I-595 Traffic Impact: :
I-595 in each direction, from east of US-441/SR-7 to Anglers Avenue, may have up to three lanes closed nightly as needed, 9 p.m. until 5:30 a.m. Tuesday through Thursday. The first lane will close at 9 p.m., the second lane will close at 9:30p.m., the third lane will close at 10:30 p.m. and reopen at 5 a.m. All lanes will be open by 5:30 a.m.
I-595 in each direction, from US-441/SR-7 to I-95, will have shoulder closures, daily and nightly as needed, Tuesday through Thursday.
The I-595 eastbound and westbound entrance ramp from I-95 southbound may have two lanes closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-595 westbound entrance ramp from I-95 southbound may have one lane closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-595 eastbound entrance ramp from I-95 northbound may have one lane closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-595 westbound entrance ramp from I-95 northbound may have one lane closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-595 eastbound and westbound exit ramp to I-95 southbound will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for steel erection operations. Motorists traveling on I-595 eastbound will be detoured via US-1 southbound and Griffin Road westbound to the I-95 southbound entrance ramp. Motorists traveling on the I-595 westbound ramp will be detoured via southbound SR-7, and eastbound Griffin Road to the I-95 southbound entrance ramp. FHP will be onsite to assist motorists.
The I-595 eastbound and westbound entrance ramp from I-95 northbound will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday for paving operations. Motorists will be detoured via Griffin Road and SR-7. Signage will be in place to assist motorists.
The I-595 exit ramp to Griffin Road will be closed to traffic nightly, 10 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured via I-95 southbound to westbound Stirling Road and northbound Anglers Avenue. FHP will be onsite to assist motorists.
The I-595 eastbound ramp to I-95 northbound ramp will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday for traffic shift operations. Motorists will be detoured via I-595, US-1, and SR-84 to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The I-595 westbound to US 441 and the Turnpike entrance ramp will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured via I-595 westbound, Davie Boulevard and I-595 EB. Signage will be in place to assist motorists.
*Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.
SR-84 Traffic Impact:
SR-84 may have one lane closed in each direction nightly, as needed, 8:30 p.m. until 5 a.m., Tuesday through Thursday.
Eastbound and westbound SR-84 will have one lane closed daily as needed, 9:30 a.m. until 3 p.m., Tuesday through Thursday.
Westbound SR-84 may have up to two lanes closed nightly as needed, 7 p.m. until 6 a.m., Tuesday through Thursday for asphalt remediation operations.
Eastbound SR-84 may have up to two lanes closed nightly as needed, 7 p.m. until 6 a.m., Tuesday through Thursday for asphalt remediation operations.
The SR-84 eastbound entrance ramp from the Turnpike will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured via the Turnpike to SR 84 and I-595 eastbound ramp. Signage will be in place to assist motorists.
The SR-84 westbound ramp to US-441 and the Turnpike entrance may be closed to traffic nightly 10:30 p.m. until 5 a.m., Tuesday through Thursday, for paving operations. Motorists will be detoured via northbound US-441, U-turn at SW 20th Street to US-441. Signage will be in place to assist motorists.
Westbound SR-84 may be closed to traffic nightly, 11 p.m. until 5 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via I-95 northbound, Davie Boulevard, and I-95 southbound to SR-84. Signage will be in place to assist motorists.
The SR-84 westbound to the eastbound frontage road may be closed to traffic nightly, 10:30 p.m. until 5 a.m. Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via SR-84 westbound, SW 26th Terrace and make a U-turn to SR-84 eastbound. Signage will be in place to assist motorists.
The SR-84 eastbound to westbound frontage road may be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via eastbound SR-84, and U-turn at SW 15th Avenue. Signage will be in place to assist motorists.
The SR-84 westbound ramp to I-95 northbound may be closed to traffic nightly as needed, 10 p.m. until 5 a.m., Tuesday through Thursday, Tuesday for bridge work operations. Motorists will be detoured via U-turn at SW 15th Avenue, northbound US-1, and Davie Boulevard to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The SR-84 eastbound to I-95 southbound entrance ramp will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured via SR-84 westbound, SW 30th Avenue, Griffin Road to the I-95 southbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound exit ramp to westbound SR-84 will be closed traffic as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for traffic shift operations Motorists will be detoured via southbound I-95, Griffin Road and SR-7 to SR-84. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to SR-84 will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via eastbound I-595, and US-1 to SR-84. Signage will be in place to assist motorists.
The I-95 southbound exit ramp to eastbound SR-84 will be closed to traffic overnight, 7 p.m. until 5 a.m., Tuesday through Thursday, for epoxy and milling operations. Motorists will be detoured via SR-84 westbound, and U-turn at SW 26th Avenue to access SR-84 eastbound. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from SR-84 eastbound will be closed to traffic overnight, 7 p.m. until 5 a.m., Tuesday through Thursday, for epoxy and milling operations. Motorists will be detoured via SR-84 eastbound, U-turn at SW 15th Avenue, and SR-84 westbound to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from westbound SR-84 will be closed to traffic overnight, 7 p.m. until 5 a.m., Tuesday through Thursday, for epoxy and milling operations. Motorists will be detoured via SW 15th Avenue, U-turn US-1, and Davie Boulevard to the I-95 NB entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to eastbound SR-84 will be closed to traffic overnight, 7 p.m. until 5 a.m., Tuesday through Thursday for epoxy and milling operations. Signage will be in place to assist motorists.
Ramp Impact:
The I-95 southbound to I-595 eastbound entrance ramp will be closed to traffic nightly, 9 p.m. until 6 a.m., Tuesday through Thursday, for steel erection operations. Motorists will be detoured via westbound I-595, southbound US-441 and I-595. Signage will be in place to assist motorists.
The I-95 southbound to I-595 westbound ramp will be closed to traffic nightly as needed, 9 p.m. until 6 a.m., Tuesday through Thursday. Traffic will be detoured via eastbound I-595, northbound US-1 northbound and westbound SR-84. FHP will be onsite to assist motorists.
The I-95 northbound to I-595 westbound entrance ramp will be closed to motorists nightly, 9 p.m. until 6 a.m., Tuesday through Thursday, for paving operations. Motorists will be detoured via Griffin Road, SR-7 and the I-595 westbound entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Griffin Road will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Traffic will be detoured via I-95 northbound to I-595 eastbound, US-1 southbound and Griffin Road. FHP will be onsite to assist motorists.
The I-95 southbound exit ramp to Stirling Road will be closed to traffic overnight, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured by westbound Sheridan Street, northbound US-441 and Stirling Road. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from Stirling Road will be closed to motorists overnight,10:30 p.m. until 5 a.m., Tuesday through Thursday, for overhead drill shaft installation. Motorists traveling westbound Stirling Road will be detoured via northbound Anglers Avenue and Griffin Road to the I-95 northbound entrance ramp. Motorists traveling eastbound will be detoured via northbound US-1 and westbound Griffin Road to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound exit ramp to Griffin Road will be closed to traffic overnight, 10 p.m. until 5 a.m., Tuesday through Thursday, for pile driving activities. Motorists will be detoured via I-95 southbound to Stirling Road westbound, Anglers Avenue northbound. FHP will be onsite to assist motorists.
The I-95 northbound entrance ramp from I-595 eastbound will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Motorists will be detoured via eastbound I-595, northbound US-1 and westbound SR-84 to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from Griffin Road will be closed to traffic nightly, 10 p.m. until 5 a.m., Tuesday through Thursday, for traffic shift operations. Motorists traveling eastbound will be detoured via eastbound Griffin Road, southbound US-1, westbound Stirling Road to the I-95 southbound entrance ramp. Motorists traveling westbound will be detoured via westbound Griffin Road, southbound Anglers Avenue, and eastbound Stirling Road to the I-95 southbound entrance ramp.
The I-95 northbound entrance ramp from I-595 westbound will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via westbound I-595, southbound I-95 and eastbound Griffin Road to the I-95 northbound entrance ramp. FHP will be onsite to assist motorists.
The I-95 southbound exit ramp to eastbound and westbound I-595 will be closed to motorists overnight, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via southbound I-95, westbound SR-84 to the I-595 entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from Griffin Road will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Traffic will be detoured via eastbound Griffin Road, northbound US-1 and westbound I-595. FHP will be onsite to assist motorists.
The I-95 southbound to I-595 westbound ramp will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Traffic will be detoured via eastbound I-595, northbound US-1 northbound and westbound SR-84. FHP will be onsite to assist motorists.
The I-95 northbound entrance ramp from Sheridan Street will be closed to traffic nightly, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for paving operations. Motorists will be detoured via Sheridan Street, US-1, and Stirling Road to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Sheridan Street will be closed nightly as needed, 10 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists will be detoured via I-95 northbound, Stirling Road, and US-1. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from Hollywood Boulevard will be closed nightly as needed, 10 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists travelling eastbound on Hollywood Boulevard will be detoured via N. Dixie Highway and Sheridan Street. Motorists traveling westbound on Hollywood Boulevard will be detoured via North Park Road, and Sheridan Street. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from Pembroke Road will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists traveling eastbound on Pembroke Road will be detoured via US-1 and Hollywood Blvd. Motorists traveling westbound will be detoured via US-441 and Hollywood Blvd to the I-95 NB entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Pembroke Road will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists will be detoured via Hollywood Boulevard, and US-1 to Pembroke Road. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Stirling Road will be closed nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for paving operations. Motorists will be detoured via Griffin Road, US-1 and Stirling Road. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from Pembroke Road will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists traveling westbound on Pembroke Road will be detoured via US-441, and Hallandale Beach Boulevard to the I-95 southbound entrance ramp. Motorists traveling eastbound on Pembroke Road will be detoured via S. Dixie Highway, and Hallandale Beach Boulevard to the I-95 southbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from Hollywood Boulevard will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists traveling westbound on Hollywood Boulevard will be detoured via South Park Road, and Pembroke Road to the I-95 southbound entrance ramp. Motorists traveling eastbound on Hollywood Boulevard will be detoured via S Dixie Highway, and Pembroke Road to the I-95 southbound entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Hollywood Boulevard will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for ITS operations. Motorists will be detoured via Sheridan Street, Dixie Highway and Hollywood Boulevard. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from Griffin Road will be closed to traffic nightly as needed, 10 p.m. until 5 a.m., Tuesday through Thursday, for traffic shift operations. Motorists traveling eastbound will be detoured by Griffin Road, US-1, and Stirling Road to the I-95 southbound entrance ramp. Motorists traveling westbound will be detoured via Griffin Road, Anglers Avenue, and Stirling Road to the I-95 southbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from Stirling Road will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday, for paving operations. Motorists will be detoured via US-1, and Stirling Road to the I-95 northbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from Hallandale Beach Boulevard will be closed to traffic nightly as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday. Motorists traveling eastbound on Hallandale Boulevard will be detoured via US-1, and Ives Dairy Road to the I-95 southbound entrance ramp. Motorists traveling westbound on Hallandale Boulevard will be detoured via US-441, and Ives Dairy Road to the I-95 southbound entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Hallandale Beach Boulevard will be closed to traffic nightly, as needed, 10:30 p.m. until 5 a.m., Tuesday through Thursday for drilled shaft installation operations. Motorists will be detoured via the Pembroke Road exit ramp, and S. Dixie Highway to Hallandale Beach Boulevard. Signage will be in place to assist motorists.
The I-595 eastbound entrance ramp from the SR-7, the Turnpike and the I-595 westbound connection will be closed to traffic nightly, as needed, 10 p.m. until 5 a.m., Tuesday through Thursday for drilled shaft installation operations. Motorists will be detoured via SR-7, Griffin Road, and I-95 NB to the I-595 EB entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from I-595 westbound may have one may have one lane closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-95 southbound entrance ramp from I-595 westbound may have one lane closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-95 southbound entrance ramp from I-595 eastbound may have one lane closed nightly as needed, 9:30 p.m. until 5 a.m., Tuesday through Thursday.
The I-95 northbound and southbound exit ramps to Griffin Road may have two lanes closed intermittently, nighty as needed, 9:30 p.m. until 5 a.m. Tuesday through Thursday.
The I-95 northbound and southbound exit ramps to Stirling Road may have two lanes closed intermittently, nighty as needed, 9:30 p.m. until 5 a.m. Tuesday through Thursday.
The I-95 northbound and southbound entrance ramps from Stirling Road may have one lane closed intermittently, nightly as needed, 9 p.m. until 5:30 a.m. Tuesday through Thursday for ITS and drill shaft operations.
*Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.
Arterial Traffic Impacts:
Anglers Avenue, from SW 36th Street to south of SW 31st Street, will be closed to motorists through late 2022 for bridge construction operations. Traffic will be detoured via SW 31st Street, SW 26th Terrace, and SW 36th Street.
SW 26 Terrace at the I-595 overpass will be close to traffic nightly as needed, Tuesday through Thursday for beam setting operations. Motorists will be detoured via westbound SR-84 and SW 30th Avenue. Signage will be in place to assist motorists.
SW 30 Avenue in each direction, at the I-595 over pass, will be closed to traffic overnight, 10 p.m. until 6 a.m., Tuesday through Thursday, for beam setting operations. Motorists will be detoured via SW 26 Terrace, and eastbound SR-84 to the U-turn movement underneath the SR-84 bridge. Signage will be in place to assist motorists.
Taft Street at I-95 will be closed to traffic in each direction nightly, 10 p.m. until 6 a.m., beginning Tuesday night, May 30 for traffic shift operations. Motorists will be detoured via N Park Road, Johnson Street, and N 26th Avenue. Signage will be in place to assist motorists. Please view the detour flyer attached.
Northbound US-441/ SR 7 will have one lane closed daily, 9 a.m. until 3:30 p.m., Tuesday through Thursday for drilled shaft operations.
SW 30 Avenue, from 34th Street to Marina Mile, may have one lane closed in each direction daily, 9:30 a.m. until 4 p.m. and nightly, 10 p.m. until 5 a.m., Tuesday through Thursday.
Griffin Road, from Old Griffin Road and Anglers Avenue, may have up to two lanes closed in each direction, nightly, 8:30 p.m. until 6 a.m., Tuesday through Thursday.
Stirling Road, from Anglers Avenue and SW 18th Street, may have up to two lanes closed in each direction, nightly 8:30 p.m. until 6 a.m. Tuesday through Thursday.
I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale (95 Express Phase 3A-1)
I-95 Traffic Impact:
I-95 will have three lanes closed in each direction, 8 p.m. until 5:30 a.m., Tuesday through Thursday. The first lane will close at 8 p.m., the second lane will close at 8:30 p.m. and the third lane will close at 9 p.m.
I-95 southbound, from Broward Boulevard to Davie Boulevard, is shifted to the outside to allow for median construction.
I-95 northbound, from Marina Mile to Davie Boulevard, has traffic shifted to the outside to allow for median construction.
I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly.
Arterial Road Traffic Impact:
Prospect Road at I-95 will have one lane closed daily, 7 a.m. until 4 p.m., Tuesday through Friday.
Commercial Boulevard at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Tuesday through Thursday, for new bridge construction. Traffic will be detoured via N. Dixie Highway, Oakland Park Boulevard and Powerline Road.
Oakland Park Boulevard will undergo a full nightly closure, 10 p.m. until 6 a.m., Tuesday through Thursday, for new bridge construction. Traffic will be detoured via Commercial Boulevard, N. Dixie Highway and Oakland Park Boulevard.
38th Street at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Tuesday through Thursday, for bridge construction. Traffic will be detoured via NW 10th Ave and Powerline Road. FHP will be on site to assist motorists.
Powerline Road at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Sunday through Thursday, as needed for bridge construction. Traffic will be detoured via Commercial Boulevard, N. Dixie Highway and Oakland Park Boulevard.
Prospect Road at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Tuesday through Thursday, as needed for bridge construction. Traffic will be detoured via Powerline Road, Commercial Boulevard and Andrews Avenue.
NW19th Street at I-95 will undergo a full nightly closure, 10 p.m. until 6 a.m., Tuesday through Thursday, as needed for ITS Pole installation. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and NW 21st Avenue.
Powerline Road at the I-95 overpass will have one lane closed daily, 9 a.m. until 3 p.m., Tuesday through Friday.
NW 19th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Tuesday through Friday.
NW 6th Street at the I-95 overpass will have one lane closed, daily, 9 a.m. until 4 p.m., Tuesday through Friday.
Oakland Park Boulevard at the I-95 overpass will have one lane closed, daily, 9 a.m. until 3 p.m., Tuesday through Friday.
Ramp Impact:
The eastbound I-595 to I-95 northbound entrance ramp from eastbound I-595 will be closed nightly as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via US 1 and Davie Boulevard. FHP will be on site to assist motorists.
The I-95 northbound exit ramp to Davie Boulevard will be closed nightly as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Broward Blvd and US 441. FHP will be on site to assist motorists.
The I-95 northbound entrance ramp from Marina Mile will be closed as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Marina Mile Boulevard, State Rd 7 and Davie Boulevard.
The I-95 southbound entrance ramp from Davie Blvd will be closed as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Davie Boulevard, US 441 and Marina Mile Boulevard.
The I-95 southbound exit ramp to Broward Boulevard will be closed as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Broward Park & Ride and Broward Blvd. FHP will be on site to assist motorists.
The I-95 northbound entrance ramp from Oakland Park Boulevard will be closed, nightly, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Commercial Boulevard and Powerline Road. FHP will be on site to assist motorists.
The I-95 northbound exit ramps to Oakland Park Boulevard will be closed as needed 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists.
The I-95 northbound exit ramp to Commercial Boulevard will be closed as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via I-95 and Cypress Creek Road. FHP will be on site to assist motorists.
The I-95 northbound entrance ramp from Commercial Boulevard will be closed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Powerline Road and Cypress Creek Road. FHP will be on site to assist motorists.
The I-95 southbound exit ramp to Commercial Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
The I-95 southbound entrance ramps from Commercial Boulevard will be closed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
The I-95 southbound entrance ramps from Oakland Park Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Powerline Road and Sunrise Boulevard. FHP will be on site to assist motorists.
The I-95 southbound exit ramp to Oakland Park Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via I-95 and Sunrise Boulevard. FHP will be on site to assist motorists.
The I-95 northbound exit ramp to Broward Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via I-95 and the Broward Boulevard Park & Ride. FHP will be on site to assist motorists.
The I-95 southbound entrance ramp from Broward Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via US-441 and Davie Boulevard. FHP will be on site to assist motorists.
The I-95 southbound exit ramp to Sunrise Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Broward Boulevard and I-95. FHP will be on site to assist motorists.
The I-95 southbound entrance ramps from Sunrise Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Powerline Road, Oakland Park Boulevard and I-95. FHP will be on site to assist motorists
The I-95 northbound entrance ramp from Davie Boulevard will be closed nightly, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via State Road 7 and Broward Boulevard.
The I-95 southbound entrance ramp from Broward Park & Ride is closed for foundation construction and sign structure installation. During this closure, traffic will be detoured via the I-95 southbound entrance ramp from Broward Boulevard.
The I-95 northbound entrance ramps from Broward Boulevard will be closed as needed, 9 pm until 5:30 am, Tuesday through Thursday. Traffic will be detoured via the Broward Boulevard Park & Ride lot and northbound I-95. FHP will be on site to assist motorists.
The I-95 northbound exit ramps to Sunrise Boulevard will be closed as needed, 9 pm until 5:30 am, Tuesday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
The I-95 northbound entrance ramps from Sunrise Boulevard will be closed, as needed, 9 p.m. until 5:30 a.m., Tuesday through Thursday. Traffic will be detoured via Oakland Park Boulevard and I-95. FHP will be on site to assist motorists.
The I-95 northbound exit ramp to eastbound Oakland Park Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Tuesday through Friday.
The I-95 northbound exit ramp to Commercial Boulevard will have one lane closed daily, 9 a.m. until 3 p.m., Tuesday through Friday.
The I-95 southbound entrance ramp from Broward Boulevard to I-595 will have one outside lane closed nightly 9 p.m. until 5:30 a.m., Tuesday through Thursday.
State Road 9/I-95 Bridge Painting Project at SR-842/ Broward Boulevard and SR-870/Commercial Boulevard
Cost/ Completion: $ million/ Spring 2025
I-95 Traffic Impact:
I-95, just south of Broward Boulevard will have up to four lanes closed in each direction nightly as needed, 10:30 p.m. until 5:30 a.m., Tuesday through Thursday, for bridge painting operations.
The I-95 southbound entrance ramp from Broward Boulevard will have one lane closed, nightly as needed, 10:30 p.m. until 5:30 a.m., Tuesday through Thursday, for bridge painting operations.
The I-95 northbound exit ramp to westbound Broward Boulevard will be closed to traffic nightly as needed, 10:30 p.m. until 5:30 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via eastbound Broward Boulevard to U-turn at NW 18th Avenue. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from westbound Broward Boulevard will be closed to traffic nightly as needed, 10:30 p.m. until 5:30 a.m., Tuesday through Thursday, for bridge painting operations. Motorists will be detoured via Broward Boulevard and U-turn NW 24th Avenue. Signage will be in place to assist motorists.
Arterial Traffic Impacts:
Westbound Broward Boulevard at I-95 will have up to 3 lanes closed nightly as needed, Tuesday through Thursday, for bridge painting operations. The first lane will close at 10:30 p.m., the second and third lane will close at midnight. All lanes will by 5:30 a.m.
SW 21st Terrace at I-95 will have one lane closed, daily and nightly as needed, Tuesday through Thursday, for bridge painting operations.
SR-9/I-95 at SR-834/Sample Road Interchange Improvements Project
I-95 northbound at Copans Road may have up to two lanes closed nightly, as needed Tuesday through Thursday. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m. Both lanes will reopen by 5:30 a.m.
I-95 southbound at Copans Road may have two lanes closed nightly, as needed Tuesday through Thursday. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m. Both lanes will reopen by 5:30 a.m.
I-95 southbound at Sample Road may have two lanes closed nightly, as needed Tuesday through Thursday. The first lane will close at 9:30 p.m., the second lane will close at 10:30 p.m. Both lanes will reopen by 5:30 a.m.
I-95 in each direction may have shoulder closures, daily and nightly as needed, Tuesday through Thursday.
The I-95 northbound Managed Lanes at Copans Road may be closed nightly, as needed, 10:30 p.m. until 5:30 a.m., Tuesday through Thursday.
The I-95 southbound Managed Lanes at Copans Road may be closed nightly, as needed, 10:30 p.m. until 5:30 a.m., Tuesday through Thursday.
Ramp Impact:
The I-95 northbound entrance ramp from eastbound Copans Road may be closed nightly, 10 p.m. until 6 a.m. Tuesday through Thursday, for drainage, ITS, lighting items and punch list work. Motorists will be detoured via Dixie Highway and Sample Road. Signage will be in place to assist motorists.
The I-95 northbound entrance ramp from westbound Copans Road may be closed nightly, 10 p.m. until 6 a.m., Tuesday through Thursday for Ramp Metering installation, drainage, ITS, lighting items and punch list work. Motorists will be detoured via Andrews Avenue and Sample Road. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Copans Road may be closed nightly, 10 p.m. until 6 a.m., Tuesday through Thursday, for Wrong Way Driver Detection System installation, drainage, ITS, lighting items and punch list work. Motorists will be detoured via northbound I-95, westbound Sample Road and southbound I-95 to the Copans Road exit ramps. Signage will be in place to assist motorists.
The I-95 southbound exit ramp to eastbound Copans Road may be closed nightly, 10 p.m. until 6 a.m., Tuesday through Thursday for ITS, drainage, lighting items and punch list work. Motorists will be detoured via I-95 southbound, Atlantic Boulevard and I-95 northbound to eastbound Copans Road. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from eastbound Copans Road may be closed nightly, 10 p.m. until 6 a.m., Tuesday through Thursday for ramp metering installation, drainage, asphalt repairs ITS, lighting items and punch list work. Motorists will be detoured via eastbound Copans Road, southbound Dixie highway and westbound Atlantic Boulevard to the I-95 southbound entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound exit ramp to westbound Copans Road may be closed nightly, 10 p.m. until 6 a.m., Tuesday through Thursday for barrier wall repairs, ITS, lighting items and punch list work. Motorists will be detoured via Atlantic Boulevard and I-95 northbound to Copans Road. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from westbound Copans Road may be closed nightly, 10 p.m. until 6 p.m., Tuesday through Thursday, for drainage, ITS, lighting items and punch list work. Motorists will be detoured via westbound Copans Road, southbound Andrews Avenue, eastbound Atlantic Boulevard to the I-95 southbound entrance ramp. Signage will be in place to assist
The I-95 southbound entrance ramp from eastbound and westbound Sample Road may be closed nightly, 10 p.m. until 6 a.m., Tuesday through Thursday. Motorists traveling on eastbound Sample Road will be detoured via Dixie Highway and Copans Road. Motorists traveling on westbound Sample Road will be detoured to N. Andrews Avenue and Copans Road. Signage will be in place to assist motorists.
*Please note that ramp closures will be performed as needed per nighttime construction operations; consecutive ramps will not be closed at the same time.
Arterial Traffic Impacts:
Copans Road at the I-95 interchange will have up to two lanes closed in each direction daily, Tuesday through Thursday. The first lane will close at 9 a.m. and the second lane will close at 10 a.m. Both lanes will reopen at 3 p.m.
Copans Road at the I-95 interchange may have up to two lanes closed in each direction nightly, Tuesday through Thursday. The first lane will close at 10 p.m. and the second lane will close at 10:30 p.m. Both lanes will reopen by 6 a.m.
SR-9/I-95 at SR-834/Sample Road Interchange Improvements Project
I-95 Traffic Impacts:
The I-95 northbound entrance ramp from eastbound Sample Road will be closed to traffic nightly as needed, midnight until 5 a.m., Tuesday through Thursday for bridge demolition and paving operations. Motorists will be detoured via Sample Road, N. Dixie Highway, and Copans Road to the I-95 NB entrance ramp. Signage will be in place to assist motorists.
The I-95 southbound entrance ramp from westbound Sample Road will be closed to traffic nightly as needed, midnight until 5 a.m., Tuesday through Thursday, for bridge demolition and paving operations. Motorists will be detoured via Sample Road, N. Andrews Avenue, and Copans Road to the I-95 SB entrance ramp. Signage will be in place to assist motorists.
The I-95 northbound exit ramp to Sample Road will be closed to traffic nightly as needed, midnight until 5 a.m., Tuesday through Thursday, for paving operations. Motorists will be detoured via SW 10th Street, and I-95 SB to Sample Road. Signage will be in place to assist motorists.
*Consecutive ramps will not be closed
Arterial Traffic Impacts:
Westbound Sample Road may have up to two lanes closed daily as needed 7 a.m. until 4 p.m., Tuesday through Friday for median construction operations.
Eastbound Sample Road may have up to two lanes closed daily as needed Tuesday through Friday for median construction operations. One lane may close from 7 a.m. until 3 p.m. Two lanes may close from 9 a.m. until 1:30 p.m.
Sample Road in each direction may have up to two lanes closed nightly, 10 p.m. until 6 a.m., Tuesday through Friday for median construction operations.
Sample Road in each direction may have up to two lanes closed daily as needed 7 a.m. until 6 p.m. Saturdays for median construction operations.
Full Closure Notice: All lanes of Sample Road at I-95, will be closed to traffic nightly, as needed, midnight until 5 a.m., Sunday through Thursday, through Thursday night, August 24 1 for bridge beam and form placement operations.
In association with this operation, the I-95 northbound entrance ramp from eastbound SR-834/Sample Road, and the SR-9/I-95 southbound entrance ramp from the westbound SR-834/Sample Road will also be closed, midnight until 5 a.m. Motorists traveling westbound on SR-834/Sample Road will be detoured via northbound SR-9/I-95, SR-869/SW 10th Street, and southbound SR-9/I-95. Motorists traveling eastbound on SR-834/Sample Road will be detoured via southbound SR-9/I-95, Copans Road, and northbound SR-9/I-95. FHP will be onsite to assist motorists. Please view the detour flyer attached.
SR 93/ I-75 Improvements Project From Sheridan Street to Griffin Road
Traffic Impacts:
I-75 in each direction will have up to two lanes closed nightly as needed 8:30 p.m. until 6 a.m., Tuesday through Thursday. One lane will close at 8:30 p.m. and two lanes will be closed by 10 p.m.
I-75 will have the shoulders closed nightly as needed, Tuesday through Thursday.
Ramp Impacts:
The I-75 southbound exit ramp to Sheridan street has been temporarily reduced to one lane through summer 2023 to safely accommodate construction operations. The lane reduction is necessary for the future traffic shift operations along I-75 mainline
SR 93/ I-75 Resurfacing Project from South of I-595 to West of US 27 in Sunrise and Weston
Traffic Impact:
I-75 in each direction, from the I-595 interchange to west of US-27, may have up to two lanes closed nightly, 8 p.m. until 7 a.m. Tuesday through Thursday for pavement marking operations.
I-75 may have the shoulders closed nightly as needed, Tuesday through Thursday.
SR 93/ I-75 Resurfacing Project from South of I-595 to West of US-27 in Sunrise and Weston
Traffic Impact:
The parking area to the south of the rest area building is closed to the public through late 2022.
The parking area to the west of the rest area building will be closed to the public for drainage operations. Motorists can use the parking area just east of the rest area building.
MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS
INTERSTATES:
Traffic Impact: Southbound I95 near mile post North of Sunrise Boulevard, in Fort Lauderdale, 9 a.m. until 4 p.m., Monday through Friday, Tuesday, May 30 through Friday, Jun. 30, 1 of 1 lanes closed as needed, for soil test borings. For more information, please contact Tate Cozort 662-210-5001.
Traffic Impact: Northbound I75 just North of Sheridan Street mile marker , in Weston, 9 p.m. until 5 a.m., One night only, Wednesday, Mar. 31 through Thursday, Jun. 01, 2 of 6 lanes closed as needed, for DMS maintenance. For more information, please contact Mark Chambers 954-328-8053.
Traffic Impact: One left lane from Northbound US 441 to Westbound I 595 will be closed from 10:00pm to 5:00am on Tuesday, May 30, 2023 to Wednesday, May 31, 2023. For more information, please contact Brittany Dieguez-De Paz at bdepaz@i595express.com.
Traffic Impact: One left lane on Westbound I 595, ½ mile East of Pine Island Road Exit will be closed from 10:00pm to 5:00am on Wednesday, May 31, 2023 to Thursday, June 1, 2023. For more information, please contact Brittany Dieguez-De Paz at bdepaz@i595express.com.
Traffic Impact: One right lane and right shoulder on Westbound State Road 84, West of Davie Road will be closed from 10:00pm to 5:00am on Thursday, June 1, 2023 to Friday, June 2, 2023. For more information, please contact Brittany Dieguez-De Paz at bdepaz@i595express.com.
|