State Road (SR) 93/I-75 Interchange at Royal Palm Boulevard Improvements Project
Financial Number: 421548-6-52-01 and 421548-7-52-01
Project Lengths:3.1 miles
Project Limits: From SR 818/Griffin Road to SW 14th Street
Virtual Public Meeting:
Start Date: September 2025
Completion Date:Summer 2028
Contractor: OHLA USA Inc.
Estimated Construction Cost:$36.2 million
Scope of Work:Project improvements consist of widening the SR 93/I-75 mainline to add an additional lane and enhance entry and exit movements; widening the SR 93/I-75 exit and entrance ramps at Royal Palm Boulevard and SR 818/Griffin Road to increase storage capacity and enhance traffic flow; widening the SR 93/I-75 bridge over the C-11 Canal to support the SR 93/I-75 mainline expansion and enhance traffic flow; installing Wrong-Way Driver Detection Systems at key locations to enhance safety: southbound SR 93/I-75 exit ramp to westbound Royal Palm Boulevard, northbound SR 93/I-75 exit ramp to westbound Royal Palm Boulevard, and northbound SR 93/I-75 exit ramp to westbound SR 818/Griffin Road; milling and resurfacing the roadway within the project limits to ensure long-term infrastructure resilience; upgrading signing and pavement markings within the project limits to enhance nighttime visibility; and upgrading existing light poles with new LED fixtures and installing additional poles throughout the project limits to enhance nighttime visibility.