Financial Number: 4325514-1-52-01 and 447678-1-52-01/02
Project Lengths: 2.3 miles
Project Limits: From SR 9/I-95 to SR 5/US 1
Virtual Public Meeting: Thursday, May 15, 2025, from 5:00 p.m. to 6:00 p.m. Please use the following link to register: https://tinyurl.com/Sunrise-Blvd-Project. You may also call +1 (415) 655-0052, attendee access code: 286-518-226.
In-Person Construction Open House: Thursday, May 15, 2025, from 6:00 p.m. to 7:00 p.m. at the ArtServe located at 1350 East Sunrise Boulevard, Fort Lauderdale, FL 33304.
Start Date: June 2025
Completion Date: Early 2029
Contractor: GLF Posillico JV
Estimated Construction Cost: $55,449,488
Scope of Work: Project improvements consist of widening SR 838/Sunrise Boulevard at the SR 9/I-95 Interchange overpass to accommodate dual right turn lanes onto northbound and southbound SR 9/I-95 to improve vehicular capacity and operations; widening the southbound SR 9/I-95 (Exit 29) off-ramp to accommodate triple left and triple right turn lanes onto SR 838/Sunrise Boulevard to improve vehicular capacity and operations; milling and resurfacing the existing roadway within the project limits to ensure long-term infrastructure resilience; installing new light poles with LED fixtures at the SR 9/I-95 Interchange to enhance nighttime visibility; installing Wrong-Way Driver detection systems on all ramps at the SR 9/I-95 Interchange to improve vehicular safety; upgrading existing signalization features to improve pushbutton accessibility and enhance pedestrian safety; adding a shared-use path on the SR 838/Sunrise Boulevard bridge over SR 9/I-95 to enhance pedestrian connectivity; and upgrading sidewalk curb ramps, pavement markings, and signage to enhance visibility and accessibility.
Documents: 435514-1 & 447678-1 Sunrise Blvd_Project Flyer.pdf
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
|