State Road (SR) 5/US 1 Resurfacing, Restoration, and Rehabilitation (RRR) Project

Financial Numbers: 447674-1-52-01

Project Length: 1.52 miles

Project Limits: From the Miami-Dade/Broward County Line to SR 824/Pembroke Road

Start Date: November 2024

Completion Date: Summer 2025

Contractor: General Asphalt Company, LLC

Estimated Construction Cost: $3,966,167

Scope of Work:

  • Milling and resurfacing the existing roadway within the project limits to ensure long-term resilience
  • Constructing a directional traffic median opening at the intersection of SE 5th Street/Breeze Way to enhance vehicular safety
  • Upgrading existing pedestrian signals at signalized intersections to improve push button accessibility
  • Upgrading concrete sidewalks, curb ramps, pavement markings, and signage to improve visibility and connectivity

Documents:

PDF Icon447674-1_US 1 RRR_Project Flyer - November 2024_v2.pdf

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Click here for upcoming lane closures

 

Pre-Construction:

US 1 RRR_Pre Con Photo Curb Ramp Reconstruction   March 2025

During Construction:

Competed Pullbox Connection   January 2025 Underground Connections   January 2025 Sidewalk Reconstruction   March 2025 Pedestrian Ramp Reconstruction   March 2025
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
95 Express
zero