State Road (SR) 844/NE 14th Street Resurfacing, Restoration, and Rehabilitation (RRR) Project
Financial Number: 447672-1-52-01
Project Lengths: .0885 miles
Project Limits: From SR 5/US 1/Federal Highway to SR A1A
Virtual Public Meeting:
Start Date: April 2025
Completion Date: Early 2026
Contractor: David’s Asphalt, Inc.
Estimated Construction Cost: $1,641,694
Scope of Work: Project improvements consist of milling and resurfacing the existing roadway within the project limits to ensure long-term infrastructure resilience, upgrading pedestrian signals at SR 5/US 1/Federal Highway and NE 23rd Avenue to improve pushbutton accessibility, upgrading existing light poles with LED fixtures at SR 5/US 1/Federal Highway and NE 23rd Avenue to improve safety and enhance nighttime visibility, and upgrading concrete sidewalks, curb ramps, pavement markings, and signage to enhance visibility and accessibility.