Treasure Coast Header Image

State Road (SR) 7/US 441 at Royal Palm Boulevard/West Copans Road Intersection Improvements Project

Financial Numbers: 449282-1-52-01 and 02

Project Lengths: 0.349 miles

Project Limits: SR 7/US 441 from NW 24th Street to Royal Palm Boulevard/West Copans Road and Royal Palm Boulevard/West Copans Road from NW 57th Terrace/East River Drive to SR 7/US 441

Project Information Video:

Start Date: March 2025

Completion Date: Summer 2026

Contractor:  Weekley Asphalt Paving, Inc.

Construction Cost: $3,974,098

Scope of Work:

The project improvements include milling and resurfacing the roadway within the project limits to ensure long-term infrastructure resilience; constructing a right-turn lane along southbound SR 7/US 441 to westbound Royal Palm Boulevard/West Copans Road to improve vehicular capacity and mobility; Modifying the median to extend the southbound SR 7/US 441 left-turn lane to eastbound Royal Palm Boulevard/West Copans Road for additional vehicular storage capacity; upgrading the existing traffic signals with mast arms to enhance long-term infrastructure durability and resilience; installing 11 new light poles and upgrading existing fixtures to LED lighting to enhance nighttime visibility and safety; and upgrading curb ramps, pavement markings, and signage within the project limits to improve visibility and connectivity.

Documents:

PDF IconUS 441 at Royal Palm_Flyer.pdf

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

Eastbound Westbound Northbound

 

 




Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyMartin County Northern Palm Beach CountySt. Lucie County Western Palm Beach CountyIndian River County

Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero