Current I-95 lane closures in Palm Beach County

February 24 - March 03, 2023

INTERSTATE 95

I-95 from south of Glades Road to south of Linton Boulevard and SR 808/Glades Road from Renaissance Way to West University Drive in the Cities of Boca Raton and Delray Beach (95 Express Phase 3B-2)

I-95 Traffic Impact:

I-95 will have up to four lanes closed in each direction nightly, 9 p.m. until 5:30 a.m., Sunday through Thursday. The first lane will close at 9 p.m., the second lane will close at 9:30 p.m., and the third and fourth lane will close at 11 p.m.

I-95 southbound from Spanish River Road to Glades Road is in a new traffic pattern with traffic shifted to the outside to allow for median construction, through March 2023.

I-95 Northbound Full Closure Notice: All I-95 northbound lanes at SR-808/Glades Road will be closed to traffic overnight, Tuesday, March 14 through Thursday, March 16 for overhead sign structure installation. The first lane will close at 9 p.m., the second lane will close at 10 p.m., and all lanes will be closed by 11 p.m., reopening by 5 a.m. each morning. Traffic will be detoured via the northbound exit ramp to SR-808/Glades Road, US-1/Federal Highway and SR-794/Yamato Road. FHP will be onsite to assist motorists. Please see detour flyer attached.

I-95 Northbound Full Closure Advanced Notice: All I-95 northbound lanes at SR-808/Glades Road will be closed to traffic overnight, Sunday, March 19 through Thursday, March 23 for overhead sign structure installation. The first lane will close at 9 p.m., the second lane will close at 10 p.m., and all lanes will be closed by 11 p.m., reopening by 5 a.m. each morning. Traffic will be detoured via the northbound exit ramp to SR-808/Glades Road, US-1/Federal Highway and SR-794/Yamato Road. FHP will be onsite to assist motorists. Sunday, March 26 will be used as a contingency night if needed. Please see detour flyer attached.

Advanced Notice: All access to and from SR-808/Glades Road at I-95 will be restricted to implement final configuration of the Diverging Diamond Interchange, 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. The weekend of March 31 to April 3 will be used as contingency if needed. Please visit the project webpage for detour details and maps: bit.ly/GladesRoadDDI.

Glades Road Impact:

The SR-808/Glades Road and I-95 interchange is in a new Diverging Diamond configuration. Please use caution as you approach the interchange – the posted speed is 35 MPH. The I-95 entrance ramps are accessible from the far left lane. The DDI is in a temporary configuration with 3 travel lanes available in each direction while outstanding work is ongoing. The final configuration of 4 lanes in each direction will be implemented by March 27, 2023.

One eastbound and westbound lane of the DDI will be closed, as needed, 9:30 a.m. until 4 p.m., Monday through Friday, for curb and sidewalk construction.

Two eastbound outside lanes of Glades Road from Renaissance Way to west of the I-95 southbound entrance ramp will be closed for drainage operations, 10 p.m., Saturday night, March 11 through 5 a.m. Monday, March 13.

Westbound Glades Road, between St. Andrews Blvd and University Drive/FAU Blvd, will have one lane closed daily, 9:30 a.m. until 4 p.m., Monday through Friday and from 9 p.m. until 6 a.m., Sunday through Thursday.

Eastbound Glades Road, between St. Andrews Boulevard and University Drive/FAU Blvd, will have one lane closed daily, 9:30 a.m. until 4 p.m., Monday through Friday and from 9 p.m. until 6 a.m., Sunday through Thursday.

To ensure pedestrian safety during roadway widening and drainage activities, the south sidewalk of Glades Road from Airport Road/NW 15th Avenue to Executive Center Drive is closed through March 2023. Pedestrian traffic is being detoured to the north sidewalk during this phase of construction. Please use caution as there is a new sidewalk configuration. Use crosswalks and adhere to pedestrian signals.

Full Closure Advanced Notice: Westbound SR-808/Glades Road at SR-9/I-95 will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via Airport Road, Spanish River Boulevard, Military Trail and Butts Road. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Full Closure Advanced Notice: Eastbound SR-808/Glades Road at SR-9/I-95 will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via Butts Road, Town Center Road, Military Trail, Palmetto Park Road and US-1/N. Federal Highway. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

SR-808/GLADES ROAD & SR-9/I-95 RAMP CLOSURES, MARCH 24-27, 2023

Full Closure Advanced Notice: The SR-9/I-95 northbound entrance ramp from westbound SR-808/Glades Road will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via Airport Road and Spanish River Boulevard. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Full Closure Advanced Notice: The SR-9/I-95 northbound entrance ramp from eastbound SR-808/Glades Road will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via Butts Road, SR-809/Military Trail, and SR-794/Yamato Road. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Full Closure Advanced Notice: The SR-9/I-95 northbound exit ramp to SR-808/Glades Road will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via SR-9/I-95 northbound and SR-794/Yamato Road. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Full Closure Advanced Notice: The SR-9/I-95 southbound entrance ramp from eastbound SR-808/Glades Road will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via Butts Road, Town Center Road, SR-809/Military Trail, and Palmetto Park Road. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Full Closure Advanced Notice: The SR-9/I-95 southbound entrance ramp from westbound SR-808/Glades Road will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via Airport Road and Spanish River Boulevard. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Full Closure Advanced Notice: The SR-9/I-95 southbound exit ramp to SR-808/Glades Road will be closed for implementation of the final configuration of the Diverging Diamond Interchange (DDI), 11 p.m., Friday, March 24 through 5 a.m., Monday, March 27. Traffic will be detoured via SR-9/I-95 and Palmetto Park Road. FHP will be on site to assist motorists. The weekend of March 31 to April 3 will be used as contingency if needed. Please see project webpage for detour flyers and maps: bit.ly/GladesRoadDDI.

Military Trail Impact:

No impacts anticipated.

Ramp Impact:

The I-95 northbound entrance ramp from westbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via westbound Glades Road, Jog Road, and Yamato Road. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from westbound Glades Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via westbound Glades Road, Powerline Road, and Palmetto Park Road. FHP will be on site to assist motorists.

The I-95 southbound entrance from eastbound Glades Road will be closed as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via eastbound Glades Road, US-1/Federal Highway and Palmetto Park Road.

The I-95 northbound exit ramp to Spanish River Boulevard will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 north, Yamato Road east, US-1, and Spanish River Boulevard. FHP will be onsite to assist motorists.

The I-95 northbound entrance ramp from Congress Avenue and Peninsula Corp. Drive will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via southbound I-95 and Yamato Road. FHP will be on site to assist motorists.

The I-95 northbound exit ramp to Congress Avenue will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Linton Boulevard. FHP will be on site to assist motorists.

The I-95 northbound entrance ramp from eastbound Glades Road will be closed nightly as needed,11 p.m. until 5 am., Sunday through Thursday. Traffic will be detoured via Glades Road east, N. Federal Highway, and Yamato Road. FHP will be on site to assist motorists.

The I-95 northbound exit ramp to Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Congress Avenue/Peninsula Corp Drive, Congress Avenue, and Yamato Road. FHP will be on site to assist motorists.

The I-95 southbound exit ramp to Yamato Road/Spanish River Blvd will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Peninsula Corp Dr, Congress Ave. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from eastbound Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via eastbound Yamato Road, US-1/Federal Highway south, westbound Glades Road, and the I-95 southbound entrance ramp from Glades Road. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from westbound Yamato Road will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via westbound Yamato Road, Congress Ave, Peninsula Corp Drive, and the I-95 southbound entrance ramp from Peninsula Corp Drive. FHP will be on site to assist motorists.

The I-95 southbound entrance ramp from Peninsula Corp Drive will be closed nightly as needed, 11 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Congress Avenue and Yamato Road. FHP will be on site to assist motorists.

Clint Moore Road Impact::

One inside lane in each direction and the westbound outside lane are open to vehicular traffic. To ensure public safety, the eastbound outside lane remains closed during drainage installation operations.

To ensure pedestrian safety during drainage activities, the south sidewalk of Clint Moore Road from Congress Avenue to NW 2nd Avenue is closed through April 2023. Pedestrian traffic is being detoured to the north sidewalk during this phase of construction.

Yamato Road Impact:

Eastbound Yamato Road at I-95 will have one outside lane closed as needed, 9:30 a.m. until 4 p.m., Monday through Friday.

Westbound Yamato Road at I-95 will have one outside lane closed as needed, 9:30 a.m. until 4 p.m., Monday through Friday.

I-95 from south of 10th Avenue N. to North of SR 882/Forest Hill Boulevard Safety Improvements Project

Traffic Impact:

I-95 between Lake Worth Road and Forest Hill Boulevard may have two lanes closed in each direction nightly, 10 p.m. to 5:30 a.m., Sunday, March 12, through Thursday, March 16, to remove temporary median walls. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at 561-886-8773 or angel@valerin-group.com.

SR 9/I-95 at SR 786/PGA Boulevard Southbound Entrance Ramps Project

Traffic Impact:

All lanes are open. For more information, please contact Community Outreach Specialist Angel Streeter Gardner at 561-886-8773 or angel@valerin-group.com.

MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS

I-95:

Traffic Impact: I-95 Ramps at Belvedere Road 10 p.m. until 5 a.m., Monday, Mar. 13 through Thursday, Mar. 16, periodic shoulder closures for pavement marking installations.

Traffic Impact: I-95 Ramps at Belvedere Road 8 a.m. until 5 p.m., Monday, Mar. 13 through Friday, Mar. 17, periodic shoulder closures for sign installations.

Traffic Impact: I-95 Ramps at Southern Boulevard 10 p.m. until 5 a.m., Monday, Mar. 13 through Thursday, Mar. 16, periodic shoulder closures for pavement marking installations.

Traffic Impact: I-95 southbound south of Summit Boulevard, Outside Lane 9 p.m. until 5 a.m., Tuesday, Mar. 14, lane closure for sign installations.

Traffic Impact: I-95 northbound north of Lantana Road, Outside Lane. 9 p.m. to 5 a.m., Thursday, Mar. 16, lane closure for sign installations.

Traffic Impact: Advance Notice: I-95 southbound south of Summit Boulevard, Outside Lane 9 p.m. until 5 a.m., Sunday, Mar. 19, lane closure for sign installations.

Traffic Impact: Advance Notice: I-95 northbound north of Lantana Road, Outside Lane 9 p.m. until 5 a.m., Monday, Mar. 20, lane closure for sign installations. For more information please contact Ido R. Shimony, P.E. at 954-579-4892.

BRIGHTLINE:

Traffic Impact: Brightline will begin testing trains at high speeds up to 110 miles-per-hour in northern Palm Beach County as soon as Friday, February 17 and continuing through the month.

Traffic Impact: The high-speed testing in Palm Beach County will take place from Jupiter, Palm Beach Gardens, North Palm Beach, Lake Park, Riviera Beach to West Palm Beach and will occur daily between 7AM and 7PM. Flaggers will be present at railroad crossings when there is ACTIVE testing taking place in the area and there will be an increased law enforcement presence around railroad crossings.

Traffic Impact: The testing is in preparation for opening to Orlando in 2023 and will continue in phases along the 129-mile rail corridor between West Palm Beach and Cocoa. Residents should be alert and follow the law around active railroad tracks and railroad crossings. Testing is expected to bring additional wait times at railroad crossings.

Traffic Impact: Brightline is making crucial safety improvements at all 156 railroad crossings along the corridor. All safety improvements have been installed at crossings in the testing areas. Those improvements vary per crossing, but may include new crossing gates, signal systems, pedestrian gates, pavement markings and roadway profiles. Where trains will operate at speeds over 79 mph, crossings have quad gates or medians to prevent motorists from driving around lowered crossing gates.

Traffic Impact: For more information, please contact Katie Mizner at (407) 502-3587 or katie.mitzner@gobrightline.com

PALM BEACH COUNTY – Railroad Crossings

Traffic Impact: Flaggers will be present at the following railroad crossings when there is ACTIVE testing taking place in the area:

Traffic Impact: Frederick Small Rd.

Traffic Impact: Donald Ross Rd.

Traffic Impact: Hood Rd.

Traffic Impact: Kyoto Gardens Dr.

Traffic Impact: RCA Blvd.

Traffic Impact: Burns Rd.

Traffic Impact: Lighthouse Dr.

Traffic Impact: Richard Rd.

Traffic Impact: North Lake Blvd. (SR 809)

Traffic Impact: Park Ave.

Traffic Impact: Silver Beach Rd.

Traffic Impact: Blue Heron Blvd. (SR 708)

Traffic Impact: Flagler St. (West 13th St.)

Traffic Impact: Inlet Blvd./MLK Jr. Blvd. (SR 710)

Traffic Impact: 49th St.

Traffic Impact: 45th St. (CR 702)

Traffic Impact: 36th St.

Traffic Impact: 30th St.

Traffic Impact: 25th St.

Traffic Impact: 23rd St.

Traffic Impact: 15th St.

Traffic Impact: Important Safety Reminders:

Traffic Impact: Residents should be alert and follow the law around active railroad tracks and railroad crossings.

Traffic Impact: Drivers, pedestrians and cyclists should be aware that rail traffic will run on BOTH tracks in BOTH directions.

Traffic Impact: Stay off the tracks and never go around crossing gates.

Traffic Impact: Only cross the railroad at designated crossings.

Traffic Impact: Never stop on the tracks.

Traffic Impact: Failure to follow the law could result in fines, points on your license or loss of life.

Traffic Impact: Jupiter – Riverside Dr. and Alternate A1A

Traffic Impact: Daytime flagging operations, 7 a.m. to 5 p.m. to move materials for bridge construction, continuing through early 2023. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit the right of way. For more information, please contact Katie Mizner at (407) 502-3587 or katie.mitzner@gobrightline.com

Traffic Impact: Jupiter – Loxahatchee River

Traffic Impact: Daytime bridge work operations, 7 a.m. to 7 p.m., Monday through Sunday, continuing through early 2023 for bridge construction. For more information, please contact Katie Mizner at (407) 502-3587 or katie.mitzner@gobrightline.com

Please click on a link below to view lane closures in other areas of Palm Beach County:
I-95 Palm Beach CountyI-95 Palm Beach County Closures Northern Palm Beach CountyNorthern Palm Beach County Closures
Southern Palm Beach CountySouthern Palm Beach County Closures Western Palm Beach CountyWestern Palm Beach County Closures
Central Palm Beach CountyCentral Palm Beach County Closures Bridges Palm Beach CountyPalm Beach County Bridge Closures
Palm Beach County Maintenance ClosuresMaintenance, Utility and Permit Closures  
 