| Financial Number: 446094-1-52-01, 446094-1-52-02, and 441799-1-52-01 Project Length: 2.008 miles Project Limits: State Road (SR) 842/Broward Boulevard from west of NW 42 Avenue to SW 22 Avenue and SR 842/Broward Boulevard from SR 7/US-441 to 27 Avenue Public Meeting: The Public Meeting was held on Thursday, February 24, 2022, at 6:00 PM, and was offered in two different formats at the same time: virtual and in-person. The virtual (online) Public Meeting was held via GoToWebinar.  https://attendee.gotowebinar.com/register/1430215457268341520.  Participants can also use their phone by dialing in to +1 (951) 384-3421; Access code: 263-168-234.  The in-person public meeting took place at the Hampton Inn Fort Lauderdale, located at  250 N Andrews Ave, Fort Lauderdale, FL 33301. The latest social distancing guidelines were followed. Both formats consisted of a formal presentation followed by an open discussion. FDOT encourages public participation without regard to race, color, national origin, age, sex, religion, disability or family status.  To view a recording of the public meeting, please click on the below link. Public Meeting Recording:  Click here: https://youtu.be/aC5F4QeRP0o  PROPOSED IMPROVEMENTS 
                    Repaving the existing roadway Replacing of existing failing paver crosswalks with regular asphalt Replacing and upgrading existing curb ramps to comply with Americans with Disabilities Act (ADA) standardsUpgrading signing and pavement markings Upgrading pedestrian signals and detectors Install Adaptive Traffic Signal System at intersections to enhance traffic mobility SAFETY IMPROVEMENTS 
                    NW 42 Avenue: Modifying the existing median opening to an eastbound left-turn only (remove the existing southbound left-turn) SR 7/US 441: Lengthen the eastbound left-turn lanes 31 Avenue and 27 Avenue: Lengthen the eastbound and westbound left-turn lanes 24 Avenue: Lengthen the westbound left-turn lane 
                      Signalization upgrades consisting of the following:Adding additional signal heads with backplates to improve signal visibility Replacing 5-section signal heads serving left-turn movements in the eastbound and westbound directions with 4-section signal heads that display flashing yellow arrow New roadway lighting along the north side of Broward Boulevard between SR 7/US 441 and 27 AvenueReplacing existing lighting fixtures to Light Emitting Diode (LED) fixtures Construction Impacts: 
                    Temporary lane closures on Broward Boulevard will be needed during off-peak hours and short-term detours of side street traffic will be necessary for replacement of the paver crosswalks
                      Off-peak hours are from 9:00 PM to 6:30 AM, Sunday through Thursday nights Access to adjacent properties will be maintained at all times  Construction Information: 
                    
                    Documents:Construction Start Date: Spring 2023Anticipated Completion: Spring 2024Construction Cost Estimate: $6.0 Million   Resurfacing, Restoration, and Rehabilitation (RRR) Project
 Contact Information:
 |